Facades installedfor main contractors.

Rainscreen cladding, SFS, render and curtain walling, installed by our teams to the system details and your programme. Send the drawings and the quantities: we price by tender.

Latest facade
Limelight, Liverpool
System
3D diagonal shaped panels
Block A
1,120 m²

ProjectFacade package completed

Limelight, Liverpool

A new-build student accommodation tower, where our team installed the 3D diagonal shaped cladding, the mesh panels, the column casings, soffits and fascias, the EPDM around the windows and the cavity fire barriers.

See the project
Limelight, Block A quantities
Item, Block AQtyUnit
3D diagonal shaped cladding panels1,120m²
Plenums and mesh panels1,260m²
Horizontal column casings1,080Lm
Soffit, inc. backing structure180m²
Fascia100Lm

Block A quantities from our price-work schedule for the project.

Rails, insulation and cavity barriers, then the first panel
3D diagonal panels turning the corner
The site: shaped-panel tower and framed block
Mesh panels and column casings, finished

How a package runs

Checked layer by layer, before anything closes it in

  1. Drawings and quantities

    You send the elevations, sections, system details and the bill of quantities. We price the labour for the package, or for one system within it.

  2. RAMS before we start

    Every project gets its own risk assessment and method statement, written for that building, that access and that system.

  3. Toolbox talks and daily checks

    The day starts with a toolbox talk and the work area is inspected daily: access, edges, fixings, housekeeping.

  4. Quality checked stage by stage

    Each layer is inspected before the next one closes it in: rails and brackets, insulation and cavity barriers, then panels and joints.

  5. Handover and 12 months

    We hand over clean elevations and stand behind our workmanship for 12 months after practical completion.

How we work on site

ProjectIn progress

Plas y Môr, Burry Port

A labour-only reclad of about 1,350 m². The old timber comes off and a new wall build-up goes on, layer by layer:

  1. Old timber cladding removed
  2. Siniat sheathing board
  3. Tenmat cavity fire barrier
  4. Aluminium rail system
  5. Hardie Plank fibre cement panels
See the project

Before you invite us to tender

The three questions estimators ask

All questions
Do you have the manpower for this package?

We put the team together around the package and the programme. Send the elevations, quantities and programme and we'll tell you, before you invite us, how we'd resource it and how we'd phase it.

What experience do you have?

Our latest completed facade is Limelight, a student accommodation tower in Liverpool, where we installed 3D diagonal shaped cladding, mesh panels, column casings, soffits, fascias, EPDM and cavity barriers. We are now recladding Plas y Môr in Burry Port in fibre cement weatherboarding.

How do you make sure the work is reliable?

A written RAMS for every project, a toolbox talk to start the day, daily inspections of the work area and a quality check on each layer before the next one covers it. Our workmanship is covered for 12 months after practical completion.

Send the drawings. We'll price the package.

Elevations, sections, system details, the bill of quantities and the programme: whatever you have. We price the labour by tender, for the whole envelope or for one system.

Or email dumitru@powerconstruction.uk · call 07393 836287